Winter Drilling at Narrows
Bralorne Resources' estimate used blocks based on true thickness and half the distance between mineralized intersections on 50 metre plans, with the deepest intersection in hole 41-3 at 71 metres vertical. The original author noted that drilling was not detailed enough to prove the structure or estimate proven reserves.